ZERO DEFECT IMPLANTING

Critical control point #1:

Sanitation

Site of Implantation
  • Scrape surface contamination with serrated knife.
  • Using a clean sponge, wash implant site with antiseptic solution (diluted chlorohexadine mixed at recommended dilution rate).
  • Using a wire brush in clean antiseptic solution, make two to three brush strokes in one direction at site of implantation.

 

Implanting Equipment
 
Work Area
  • Work area should be kept clean and supplies arranged in an orderly fashion.

 Back to top

Critical control point #2:

Operator Training

 

Back to top

Critical control point #3:

Implanting Procedure

 
  • Clean and prepare implant site according to outlined procedure above
  • Insert the needle at the outer 1/3 of ear.
  • Insert the needle between the skin and cartilage (avoid digging into cartilage).
  • Deposit implant in the middle one-third of the ear. Withdraw needle. Check implant by running thumb over site. Pinch implant insertion site while giving a gentle push to assure implant is not located at the insertion site.
   

Back to top

Critical control point #4:

 Implant Quality Control Verification

 
 
Back to top

 

HOME  |  ABOUT VETLIFE  |  PRODUCTS  |  BENCHMARK  |  NEWS & INFO  |  LINKS  |  CONTACT US

All Contents © 2006 Ivy Animal Health, Inc. | Trademarks | Privacy Policy | Site Map